Asterholma, Finsko

  • Typ budovy:
  • Energetické stavby
Celá obrazovka Zavřít

In the summer of 2023, Peikko supplied key foundation components to the Asterholma project in Åland, including one Rock Adapter foundation fully manufactured in Finland.

SUVIC managed the civil works, with Peikko providing 40 pieces of FATBAR® 56 Post-Tensioned Anchors, each 12 meters long, along with one Rock Adapter plate set with short tower bolts for an Enercon E70 turbine.

The Rock Adapter solution features the most compact foundation, reducing concrete use by eliminating the traditional anchor cage.

The FATBAR® Post-Tensioned Anchor offers proven quality as an ETA-assessed and CE-marked product, ensuring a safe and reliable solution. Its compact design is optimized for material efficiency, environmental consciousness, and cost-effective installation. Additionally, the FATBAR anchor simplifies risk management with easy re-tensioning, supporting hassle-free maintenance throughout the foundation's lifecycle.

For more information on FATBAR®, please visit: Peikko.com/fatbar

 

Přečtěte si více down-arrow.png

Fakta o projektu

Developer:
Asterholma Vindenergi AB
Stavební firma:
Suvic Oy
Rok dodání:
2023
Rok dokončení:
2023
Počet turbín:
1
Výrobce turbín:
Enercon
Velikost turbíny, MW:
E-70 E4/S/69/4F/01 2.8MW
Výška osay dělení, m:
69

Řešení, které jsme poskytli

Kontaktujte nás