City Electrical Factors (CEF) IT and Marketing Office, Durham, Velká Británie

  • Typ budovy:
  • Kancelářské budovy
Celá obrazovka Zavřít Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Přečtěte si více down-arrow.png

Fakta o projektu

Velikost projektu:
2100 m2
Podlahy:
2
Developer:
CEF Ltd
Stavební firma:
PCE Ltd
Statik:
Curtins
Architekt:
FaulknerBrowns
Rok dodání:
2016
Rok dokončení:
2017

Kontaktujte nás

Michael Scott

Michael Scott

Sales Manager, Deltabeam Products

England & Wales

Tel. +44 1325 318619
Mob. +44 755 7118470
[email protected]