Water treatment plant, Eindhoven, Holandsko

  • Typ budovy:
  • Průmyslové budovy
  • Infrastruktura
Celá obrazovka Zavřít Street View

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Fakta o projektu

Developer:
Waterschap De Dommel
Stavební firma:
Van Boekel Bouw & Infra
Prefa závod:
Haitsma Beton
Rok dodání:
2019
Rok dokončení:
2020

Řešení, které jsme poskytli

Kontaktujte nás